Detailed use steps and instructions of vacuum drying oven series
Author: BLLA Published: 2013-3-8 Visits: 2179

1.Using environment requirements:

a) Temperature: 5 ~ 40 ℃
b) Relative humidity: ≤85% RH
c) Power supply voltage: AC220V ± 10% 50Hz
d) No strong vibration and corrosive gas influence around
2.Vacuum debugging:
a) Close the box door and tighten the door handle in place, close the air release valve (twist the hole on the rubber stopper and the hole on the air release valve by 90 °), open the vacuum valve (rotate 90 ° counterclockwise) The vacuum valve switch may be tight and can be rotated with a single use.
b) Connect the vacuum drying box exhaust pipe (outer diameter: Φ16mm) to the vacuum pump (2XZ-2, inlet diameter Φ16mm) with a vacuum tube (inner diameter: Φ16mm wall thickness: 10mm) with random accessories (type 6090 and 6210 Comes with a vacuum pump, connected). Turn on the vacuum pump power and start pumping. When the vacuum gauge indicates -0.1Mpa, first close the vacuum valve and then turn off the vacuum pump power to prevent the vacuum pump oil from flowing back into the working room. (6090 and 6210 without vacuum valve can be closed directly The vacuum pump power supply on the panel is now in a vacuum state.
3.Vacuum box debugging:
After the vacuum degree debugging is completed, the following operations can be performed:
a. Turn on the power of the vacuum box. At this time, the power indicator should be on. temperature. The OUT lamp on the temperature controller should be on, indicating that the meter has entered the working state of heating.
b. Modify the set temperature
(1). Press the function key (SET) of the temperature controller; after the SP character is displayed in the PV box, you can use the key button to modify the set temperature. The same applies below).
(2). After the modification is completed, press the SET key again, the ST character will be displayed on the PV screen to set the timing time. If you don't use the timing function, let ST = 0
(3). Press the SET key again to make the PV screen display the temperature of the working room, and the SV screen display the new set temperature. The AT and HEAT lights of the meter are on. At this time, the meter enters the heating working state again.
c. When the temperature in the working room is close to the set temperature, the HEAT light is on and off, indicating that the heating has entered the PID adjustment stage. The meter sometimes measures the temperature above the set temperature, and sometimes it is lower than the set temperature. When the measured temperature is close to or equal to the set temperature, wait for about 1 hour, the working room enters a constant temperature state, and the item enters the drying stage.
d. When the required temperature is low, the secondary setting method can be adopted. For example, if the required operating temperature is 70 ° C, the first setting is 60 ° C. After the temperature overshoot starts to fall back, the second setting is 70 ° C. This can reduce or even eliminate the temperature overshoot and enter a constant temperature state as soon as possible.
e. When the items are dried, turn off the power. If the temperature is accelerated, open the air release valve to make the vacuum 0, and wait for about 5 minutes before opening the box door.
4. If the humidity of the dry material in the work room is large, the generated water and gas will affect the performance of the vacuum pump. It is recommended that a "dryer / filter" be connected between the drying box and the vacuum pump. The company can equip a dryer with an external dimension of Φ120 × 300mm and an interface outer diameter of Φ16 as required.
5. If it is necessary to add inert gas such as nitrogen during the drying process, it should be specified in the contract and an additional air inlet valve should be added.
note:
1. If the vacuum pump is normal and meets the technical requirements and cannot be evacuated, open the door of the box and use the wrench in the product attachment to twist the door buckle on the box inward to close it and close the door again.
2. This vacuum drying box cannot be used as an electric heating drying box, because the working room is not in a vacuum state, the measurement temperature is extremely different from the actual temperature in the working room.
Previous: The use and maintenance method of high speed centrifuge Next: Centrifugal force and relative centrifugal force of centrifuge

博翎·阿里巴巴 上海市计量检测中心 流量计 不锈钢 佳吉物流查询 德邦物流查询 顺丰快递查询 圆通速递查询 Links: Bosong · Chemical Instrument Network Bosong · Alibaba Shanghai Metrology and Testing Center Flowmeter Stainless Steel Jiaji Logistics Inquiry Debang Logistics Inquiry SF Express Inquiry Yuantong Express Inquiry
Copyright: Shanghai Bosong Instrument and Equipment Co., Ltd. Address: No. 885 Kegong Road, Fengxian District, Shanghai
Service Hotline: 021-60499716 E-mail: biolab@aliyun.com
© 2010 All Rights Reserved by 沪 ICP 备 15006004 号

Shanghai Public Network Security No. 31012002002424